Rows of blue solar panels stretch diagonally across a green grassy field while a small flock of sheep grazes peacefully between the panels.
STA02-furzen-solar-farm

In Development

Furzen Solar Farm

Project introduction

Furzen Solar Farm will be located on land north-west of the East Claydon National Grid substation, between Steeple Claydon and Winslow in the county of Buckinghamshire.

This proposal will be able to generate enough affordable, clean and domestic electricity to meet the needs of over 23,900 UK homes. It would also save over 1.6 million tonnes of CO2 compared to fossil fuel generation – that is equivalent to taking more than 377,300 cars off the road for a year or planting over 26 million trees.

We place immense value on local input. Your feedback is integral to our process and will help shape the final proposals.

Site location

RWE Image

Click on the image to zoom

Facts & figures

Over £ 00 million

in business rates

Over 00 km

new hedge planting

00 acres

wildflower meadow and copse planting

Over 00 million

tonnes CO₂ saved

Over 00

UK homes powered

Over 00 %

biodiversity net gain

The need for solar

The UK is committed to achieving a fully decarbonised power system by 2030, a goal that hinges on embracing and expanding reliable, affordable, and clean energy solutions like solar power. In alignment with this, the Furzen Solar Farm will contribute significantly to both local, and national climate commitments, providing clean, secure, domestic and affordable energy to thousands of UK homes.

Such schemes can only be developed in areas which benefit from an available/viable connection to the local/national grid network.

The need for solar

Six solar myths busted


Working with communities

Working in partnership with local communities to unlock a project’s full potential is at the heart of what we do. Our work with local people shapes the future of our projects and ensures the benefits of solar energy developments are realised in a way that positively impacts them.

We pride ourselves on listening to, and knowing the communities we work with by prioritising our understanding of local sentiment. We listen to, and build relationships with, the people, organisations, and stakeholders we work with, to understand their views and accommodate change where possible, helping to leave a positive legacy behind when our work is complete.


Project benefits

A blue cloud icon displaying CO2, indicative of carbon dioxide emissions.

CO2

Saving over 1.6 million tonnes of CO2 versus fossil fuel generation, the equivalent of planting over 26 million trees.

Simple graphic of two stylised trees and a directional sign with arrows, set against a white background.

Green Infrastructure

Existing rights of way enhanced with accessible gates/benches, new picnic areas, community orchards and accessible wildflower meadows, and educational boards detailing local wildlife.

A stylised blue outline of a hand with a heart symbol on the palm, set against a white background.

Community Benefit Fund

Genuine benefits for local residents, including community benefit fund of up to £800,000 over the lifetime of the project.

A simple line drawing of a sheep with a rounded body, four legs, and a smiling face.

Grazing

The ability for over 95% of the site to be used for sheep grazing and remain in farming use, allowing topsoil to recover, by increasing soil organic matter and improving the soil structure.

A simple blue icon of a birdhouse with a bird inside the circular opening.

Biodiversity Net Gain

Over 50% biodiversity net gain providing ecological benefits through new habitats, such as wildflower meadows, grassland areas, bird nesting boxes, bat boxes and beehives.

A blue-lined illustration of a coin featuring the pound sterling symbol (£) in the centre, set on a plain white background.

Business Rates

Council business rates paid in excess of £3.3 million over the life of the development, funding vital local services.

Public consultation

Our public consultation for the plans will run from Monday 3rd August until Monday 14th September 2026 with 2 in person consultation days held on:

  • Tuesday 18th August, from 12:00 pm to 6:00 pm, at Steeple Claydon Village Hall, MK18 2PY
  • Wednesday 9th September, from 12:00 pm to 6:00pm, at East and Botolph Claydon Village Hall, MK18 2LR

Our plans are at an early stage, so we’d welcome the opportunity to discuss the proposals and answer any questions you may have.

Frequently Asked Questions

  • Do RWE engage with the local community?

    Thorough and meaningful community engagement is at the heart of our approach to development. We seek to meet with local residents, organise consultation days, and present plans at an early stage to local stakeholders and groups as part of our consultations. We also regularly partner with local wildlife, school and community groups.

    Will there be a benefit to the local community?

    Yes, in addition to a £800,000 community benefit fund to support community projects/initiatives, we incorporate outdoor educational spaces, picnic benches, and new public green spaces like wildflower meadows and community orchards into our sites. We also seek to support local people/businesses when it comes to the construction and operation of our sites.

    Do solar farms create jobs, and do you hire locally?

    Yes. There are considerable opportunities for local suppliers throughout both the construction and operation phases of the site. Construction staff are also likely to use local accommodation and shops / restaurants, supporting the local economy. RWE also run an industry apprenticeship programme, helping future generations gain the key skills they need to participate in the transition to a green energy system.

  • Is solar expensive?

    Not at all. Large scale solar is one of the cheapest forms of electricity generation, with costs expecting to drop even lower in the future given it does not need expensive inputs to operate.

    How does a solar PV installation work?

    PV panels are installed in rows on the land, usually separated by between 4-10m. This ensures grass can successfully grow underneath the panels and can be grazed by sheep. The panels convert light into electricity which is then distributed to our houses/businesses via the grid network.

    How long do PV modules last?

    The lifespan of PV panels is 40 years which is why we seek planning permission for 40 years on our sites. After this time the site is restored back to its former state, never losing its greenfield status in the process.

  • What is the construction time?

    This depends on the size of the installation. A typical build time is around nine to twelve months for a typical project.

    Are solar farms built with the landscape in mind?

    Absolutely, we work closely with communities to ensure that our solar farms blend in and restore traditional meadows and hedgerows to the countryside. The maximum height of our solar panels is three metres, which is the same as a well-maintained hedgerow. Extensive new hedgerow/tree and wildflower planting also helps local wildlife, in addition to screening views of the solar farm.

    Do solar panels create glint and glare?

    Solar panels are designed to absorb light not reflect it. The more light a panel absorbs, the more power it will generate. Modern panels are installed with an anti-reflective matte coating to maximise efficiency and reduce glint and glare that can be seen on older solar farms.

    Why are most solar farms built on agricultural land?

    Ground-mounted solar is one of the cheapest forms of energy generation, with a fivefold increase in solar capacity anticipated by 2030 in the Government’s Energy Security Strategy 2022.

    This cannot be achieved through rooftop and brownfield solar installations alone, as many domestic and industrial buildings either do not have roofs made of suitable material to support a solar system, do not have the infrastructure to export electricity to the grid, or simply present as an unaffordable solution, with initial costs of installation too high for some. As a result, agricultural land is used, without impacting on food security, given the ability to still graze sheep/chickens on the farm. If we were to hit our renewable energy targets, we would use just 0.3% of the UK’s land for solar farms, less than the land mass currently used for golf courses.

    Does land used for solar farms reduce food security?

    No. The UK Food Security Report states that climate change is one of the largest threats to domestic food production (with a 73% loss of ‘good’ quality farmland predicted by 2050 due to climate change), solar farms provide an opportunity to significantly reduce carbon emissions and tackle this threat. Solar farms provide valuable income for farmers and can still be used for grazing (sheep or chicken) due to the spacing between the rows of panels, allowing a high-quality grassland to grow around/underneath the panels. There are many excellent examples of successful sheep and chicken farms across the country that run pastoral farms within an existing solar farm.

    How much space will solar farms take up?

    Very little. Even under 2050 Net Zero targets, Solar farms would occupy around 0.3% of the UK’s land – less that what is currently used by golf courses.

    Once built, will the development be noisy?

    Panels are generally static, so do not produce any noise. We undertake a full background noise assessment to ensure any noise that is generated is within acceptable levels. Any items which may generate noise are placed in the centre of the site, away from houses.

    Will there be much disturbance during construction?

    We aim to access sites and manage all traffic in such a way that it will have a minimum impact on surrounding communities We compose a construction traffic management plan which is prepared with the input from the local Highway Authority.

    Will there be fencing around the site?

    Yes. We install a deer fence (wooden posts and wire) around the site in order to keep it secure. The fencing includes mammal gates that will allow small animals to pass through, and our designs include green corridors to ensure free movement of wildlife through the site.

Virtual exhibition

Visit our virtual exhibition to view more information about the project.

Read more

Feedback

Your voice matters. This feedback channel gives everyone the opportunity to share their thoughts and help share the proposals. The deadline for submitting feedback to this consultation is 14th September 2026.

Read more

Project manager

I’m Robin and I’m the project manager for Furzen Solar Farm.

As a trained ecologist, coming from a wildlife conservation background, I’ve always placed a focus on maximizing the benefits for local wildlife on the schemes I develop.

Please don’t hesitate to get in touch any time by email, or in writing.

A young man with short blonde hair, wearing a light blue button-up shirt, against a plain grey background.
CON01-robin-johnson

Robin Johnson

Project Manager

RWE Solar and Storage UK
The Northcliffe,
26-28 Tudor Street,
London, EC4Y 0AY

You might also be interested in

Solar projects

All our solar projects in development at a glance.

Go to map

Project proposals for renewable energy

Green energy future under construction and in development.

Read more

In your community

Funding sustainable communities.

Read more