Project introduction

Furzen Solar Farm will be located on land north-west of the East Claydon National Grid substation, between Steeple Claydon and Winslow in the county of Buckinghamshire.

This proposal will be able to generate enough affordable, clean and domestic electricity to meet the needs of over 23,900 UK homes. It would also save over 1.6 million tonnes of CO2 compared to fossil fuel generation – that is equivalent to taking more than 377,300 cars off the road for a year or planting over 26 million trees.

We place immense value on local input. Your feedback is integral to our process and will help shape the final proposals.

Site location

RWE Image

Click on the image to zoom

Facts & figures

Over £ 00 million

in business rates

Over 00 km

new hedge planting

00 acres

wildflower meadow and copse planting

Over 00 million

tonnes CO₂ saved

Over 00

UK homes powered

Over 00 %

biodiversity net gain

The need for solar

The UK is committed to achieving a fully decarbonised power system by 2030, a goal that hinges on embracing and expanding reliable, affordable, and clean energy solutions like solar power. In alignment with this, the Furzen Solar Farm will contribute significantly to both local, and national climate commitments, providing clean, secure, domestic and affordable energy to millions of UK homes.

The need for solar

Six solar myths busted


Working with communities

Working in partnership with local communities to unlock a project’s full potential is at the heart of what we do. Our work with local people shapes the future of our projects and ensures the benefits of solar energy developments are realised in a way that positively impacts them.

We pride ourselves on listening to, and knowing the communities we work with by prioritising our understanding of local sentiment. We listen to, and build relationships with, the people, organisations, and stakeholders we work with, to understand their views and accommodate change where possible, helping to leave a positive legacy behind when our work is complete.


Project benefits

A blue cloud icon displaying CO2, indicative of carbon dioxide emissions.

CO2

Saving over 1.6 million tonnes of CO2 versus fossil fuel generation, the equivalent of planting over 26 million trees.

Simple graphic of two stylised trees and a directional sign with arrows, set against a white background.

Green Infrastructure

Existing rights of way enhanced with accessible gates/benches, new picnic areas, community orchards and accessible wildflower meadows, and educational boards detailing local wildlife.

A stylised blue outline of a hand with a heart symbol on the palm, set against a white background.

Community Benefit Fund

Genuine benefits for local residents, including community benefit fund of up to £800,000 over the lifetime of the project.

A simple line drawing of a sheep with a rounded body, four legs, and a smiling face.

Grazing

The ability for over 95% of the site to be used for sheep grazing and remain in farming use, allowing topsoil to recover, by increasing soil organic matter and improving the soil structure.

A simple blue icon of a birdhouse with a bird inside the circular opening.

Biodiversity Net Gain

Over 50% biodiversity net gain providing ecological benefits through new habitats, such as wildflower meadows, grassland areas, bird nesting boxes, bat boxes and beehives.

A blue-lined illustration of a coin featuring the pound sterling symbol (£) in the centre, set on a plain white background.

Business Rates

Council business rates paid in excess of £3.3 million over the life of the development, funding vital local services.

Public consultation

Our public consultation for the plans will run from Monday 3rd August until Monday 14th September 2026 with 2 in person consultation days held on:

  • Tuesday 18th August, from 12:00 pm to 6:00 pm, at Steeple Claydon Village Hall, MK18 2PY
  • Wednesday 9th September, from 12:00 pm to 6:00pm, at East and Botolph Claydon Village Hall, MK18 2LR

Our plans are at an early stage, so we’d welcome the opportunity to discuss the proposals and answer any questions you may have.

Virtual exhibition

Visit our virtual exhibition to view more information about the project.

Read more

Feedback

Your voice matters. This feedback channel gives everyone the opportunity to share their thoughts and help share the proposals. The deadline for submitting feedback to this consultation is 14th September 2026.

Read more

Project manager

I’m Robin and I’m the project manager for Furzen Solar Farm.

As a trained ecologist, coming from a wildlife conservation background, I’ve always placed a focus on maximizing the benefits for local wildlife on the schemes I develop.

Please don’t hesitate to get in touch any time by email, or in writing.

A young man with short blonde hair, wearing a light blue button-up shirt, against a plain grey background.
CON01-robin-johnson

Robin Johnson

Project Manager

RWE Solar and Storage UK
The Northcliffe,
26-28 Tudor Street,
London, EC4Y 0AY

You might also be interested in

Solar projects

All our solar projects in development at a glance.

Go to map

Project proposals for renewable energy

Green energy future under construction and in development.

Read more

In your community

Funding sustainable communities.

Read more