Four sheep are grazing beneath a row of solar panels on a grassy field.
STA02-butterfly-solar-farm

In development | Solar Farm

Craig Y Perthi Solar Farm

Project Introduction

Craig Y Perthi Solar Farm will be located  between the M4 and the Llanwern Tata Steelworks, to the east of Llanwern, and to the east/west of Bishton, in Newport, South Wales.

This proposal will be able to generate enough affordable, clean electricity to meet the needs of over 42,077 Welsh homes. It would also save over 2.7 million tonnes of CO2 compared to fossil fuel generation – that’s equivalent to taking more than 652,000 cars off the road for a year or planting over 46 million trees.

Significant positive changes have been made to the plans since the original submission in 2024, including a reduction in the total site area (from 240 ha to 196 ha), the increased provision of lapwing nesting land (from 12 ha to 16.5 ha), the removal of a panelled area adjacent to St Mary’s Church, the removal of the provision for Battery Storage containers from the plans, and the removal of all land located within the Gwent Levels SSSI from the scheme. We place immense value on local and professional stakeholder input. Your feedback is integral to our process, and will help shape the final proposals.

Site Location

A color map shows a red boundary across fields and streets, with a right legend reading "Application Boundary", "Figure 1 - Location Plan" and "RWE".

Click on the image to zoom

Facts & figures

Over £ 00 million

in business rates

00 km+

new hedgerow/tree planting

00 km+

new permissive paths

00 acres+

wildflower meadow creation

00 million tonnes

CO₂ saved

Over 00

Welsh homes powered

The need for Solar

The Welsh Government is committed to achieving a fully renewable, more affordable domestic power system by 2035, a goal that hinges on embracing and expanding clean energy like solar. In 2024, just 53% of Wales’ domestic electricity consumption came from renewables, a sharp reduction from 2022 figures (59%). In alignment with this target,  Newport City Council declared a climate and ecological emergency in 2021,seeking to become carbon neutral by 2030. Projects like the Craig Y Perthi Solar Farm would contribute significantly to both local, and national climate commitments.

The need for solar

Six solar myths busted


Project benefits

A blue cloud icon displaying CO2, indicative of carbon dioxide emissions.

CO2

Saving over 2.7m tonnes of CO2 versus fossil fuel generation, the equivalent of planting over 46 million trees.

Simple graphic of two stylised trees and a directional sign with arrows, set against a white background.

Green Infrastructure

Existing rights of way widened to 10m and enhanced with accessible gates/benches, 3km of new permissive footpaths, community orchards and accessible wildflower meadows, and educational boards detailing local wildlife.

A stylised blue outline of a hand with a heart symbol on the palm, set against a white background.

Community Benefit Fund

Genuine benefits for local residents including a community benefit fund of over £1.5m.

A simple line drawing of a sheep with a rounded body, four legs, and a smiling face.

Grazing

The ability for over 95% of the site to be used for sheep grazing and remain in farming use, allowing topsoil to recover, by increasing soil organic matter and improving the soil structure.

A simple blue icon of a birdhouse with a bird inside the circular opening.

Biodiversity Net Gain

Over 50% biodiversity net gain providing ecological benefits through new habitats, such as over 106 acres of new wildflower meadows, diverse grassland under and around panelled areas, new wetland meadows, bird nesting boxes, reptile hibernacula and bee hotels.

Two stylised trees illustrated with simple lines in dark blue on a white background.

Landscape and Ecology

Landscaping enhancements such as over 11km of new hedgerow and tree planting, and 106 acres of new butterfly/bee friendly wildflower meadow.

An illustration of a battery next to a power plug, representing energy and charging concepts.

Batteries

Following community feedback, the battery storage element has been removed from the plans. 

A blue-lined illustration of a coin featuring the pound sterling symbol (£) in the centre, set on a plain white background.

Business Rates

Council business rates paid in excess of £10m over the life of the development, funding vital local services.

Public consultation

A formal and informal public consultation on the proposals was run for the previous iteration of the plans in 2021/2022 and 2023, with 4 in person events held in the local community. As part of our resubmission we will be running another consultation for 6 weeks from 10th August to 21th September 2026 with in-person events held at;

  • Wednesday 19th August 2.30-7.30pm at Langstone Village Hall, Langstone, NP18 2NP 
  • Thursday 20th August 1-6pm at Llanwern Village Hall, Llanwern, NP18 2DW
  • Monday 7th September 1-6pm at Bishton Village Hall, Bishton, NP18 2DZ 
  • Tuesday 8th September 1-6pm at Underwood Community Centre, Underwood, NP18 2HW

Following this we will carefully consider all feedback, and use these to help shape the final designs. 

Frequently Asked Questions

  • How is this different from the original application made in 2024?

    Significant positive changes have been made to the plans since the original submission in 2024, including a reduction in the total site area (from 240 ha to 196 ha), the increased provision of lapwing nesting land (from 12 ha to 16.5 ha), removal of the provision for Battery Storage containers from the plans alongside other infrastructure, and the removal of all land located within the Gwent Levels SSSI from the scheme.

    Do RWE engage with the local community?

    Thorough and meaningful community engagement is at the heart of our approach to development. We seek to meet with local residents, organise consultation days, and present plans at an early stage to local stakeholders and groups as part of our consultations. We also regularly partner with local wildlife, school and community groups.

    Will there be a benefit to the local community?

    Yes, in addition to a £1.5 million community benefit fund to support community projects/initiatives, we incorporate new accessible/permissive footpaths, outdoor educational spaces, picnic benches, and new public green spaces like wildflower meadows and community orchards into our sites. We also seek to support local people/businesses when it comes to the construction and operation of our sites.

    Do solar farms create jobs, and do you hire locally?

    Yes. There are considerable opportunities for local suppliers throughout both the construction and operation phases of the site. Construction staff are also likely to use local accommodation and shops / restaurants, supporting the local economy. RWE also run an industry leading apprenticeship programme, helping future generations gain the key skills they need to participate in the transition to net zero/renewables. The green economy is one of the fastest growing sectors, worth an estimated £100bn per year to the UK, with over 1 million people employed. 

  • Is solar popular?

    Definitely. According to Government polling, solar is the most popular energy source, with over 80% of respondents stating they support it. When asked about a solar farm being built in their local area, a poll in 2022 found that a considerable 88% of respondents in said they weren’t opposed.

    Does solar PV work well in Wales? Is it sunny enough?

    Absolutely. Solar works well everywhere in Wales. Solar panels don’t need direct sunlight to operate and produce power during day light hours all year round.

    Is solar expensive?

    Not at all. Large scale solar is one of the cheapest forms of electricity generation, with costs expecting to drop even lower in the future given it does not need expensive inputs to operate.

    How does a solar PV installation work?

    PV panels are installed in rows on the land, usually separated by between 4-10m. This ensures grass can successfully grow underneath the panels and can be grazed by sheep. The panels convert light into electricity which is then distributed to our houses/businesses via the grid network.

    How long do PV modules last?

    The lifespan of PV panels is 40 years which is why we seek planning permission for 40 years on our sites. After this time the site is restored back to its former state, never losing its greenfield status in the process.

    What is the construction time?

    This depends on the size of the installation. A typical build time is around nine to twelve months for a typical project.

  • Are solar farms built with the landscape in mind?

    Absolutely, we work closely with communities to ensure that our solar farms blend in and restore traditional meadows and hedgerows to the countryside. The maximum height of our solar panels is three metres, which is the same as a well-maintained hedgerow. Extensive new hedgerow/tree and wildflower planting also helps local wildlife, in addition to screening views of the solar farm.

    Do solar panels create glint and glare?

    Solar panels are designed to absorb light not reflect it. The more light a panel absorbs, the more power it will generate. Modern panels are installed with an anti-reflective matte coating, to maximise efficiency, and reduce glint and glare that can be seen on older solar farms. Solar farms are now regularly built next to airport runways and motorways without issue.

    Why are most solar farms built on agricultural land?

    Ground mounted solar is one of the cheapest forms of energy generation, with a fivefold increase in solar capacity is anticipated by 2030 in the Government’s Energy Security Strategy 2022. This cannot be achieved through rooftop and brownfield solar installations alone, as many domestic and industrial buildings either do not have roofs made of suitable material to support a solar system, do not have the infrastructure to export electricity to the grid, or simply present as an unaffordable solution, with initial costs of installation too high for some. As a result, agricultural land is used, without impacting on food security given the ability to still graze sheep/chickens on the farm. If we were to hit our renewable energy targets, we’d use just 0.3% of the UK’s land for solar farms, less than the land mass currently used for golf courses.

    Does land used for solar farms reduce food security?

    No. The UK Food Security Report states that climate change is one of the largest threats to domestic food production (with a 73% loss of ‘good’ quality farmland predicted by 2050 due to climate change), solar farms provide an opportunity to significantly reduce carbon emissions and tackle this threat. Solar farms provide valuable income for farmers and can still be used for grazing (sheep or chicken) due to the spacing between the rows of panels allowing a high-quality grassland to grow around/underneath the panels. There are many excellent examples of successful sheep and chicken farms across the country that run pastoral farms within an existing solar farm.

    How much space will solar farms take up?

    Very little. Even under 2050 Net Zero targets, Solar farms would occupy around 0.3% of the UK’s land – less that what is currently used by golf courses.

    Once built, will the development be noisy?

    Panels are generally static, so do not produce any noise. We undertake a full background noise assessment to ensure any noise that is generated is within acceptable levels. Any items which may generate noise are placed in the centre of the site, away from houses.

    Will there be much disturbance during construction?

    We aim to access sites and manage all traffic in such a way that it will have a minimum impact on surrounding communities We compose a construction traffic management plan which is prepared with the input from the local Highway Authority.

    Will there be fencing around the site?

    As is commonplace across farms on the countryside and in allotments, we install a deer fence (wooden posts and wire) around the site in order to keep it secure. The fencing includes mammal gates that will allow small animals to pass through, and our designs include green corridors to ensure free movement of wildlife through the site. 

Virtual Exhibition

Visit our virtual consultation exhibition space to find out more about the project.

Read more

Feedback

The formal consultation will run for 6 weeks from the 10th August until the 21th September 2026, with feedback encouraged.

Read more

Project Manager

My name’s Robin, and I’m the project manager for the Craig Y Perthi Solar Farm. I come from a wildlife conservation background, and am passionate about the natural world, having trained as an ecologist. Solar farms offer a unique opportunity to create vast, undisturbed habitats, free from intensive agricultural practices and pesticide/fertiliser use. I look forward to discussing the project in further detail with you.

A young man with short blonde hair, wearing a light blue button-up shirt, against a plain grey background.
CON01-robin-johnson

Robin Johnson

Project Manager

RWE Renewables UK
26 Tudor St,
London,
EC4Y 0AY

You might also be interested in

Solar power portfolio

Find out more about our solar power portfolio in the UK

Read more

Project proposals for renewable energy

Green energy future under construction and in development.

Read more

In your community

Funding sustainable communities.

Read more